Yangquan alumina refinery
The 600kt/a expansion project was completed by September 2012, but commissioning was delayed to end of 2013. Bauxite and caustic soda are both capt...
Qingzhen alumina refinery
Production capacity at the refinery is expected to reach 800kt/a by 2015. SGA will supply Guizhou-based smelters and be sold to trading companies. ...
Mettur Dam alumina refinery
Production ceased in 2009, a year after the closure of the adjacent smelter. We have no base case restart. Wood Mackenzie’s asset reports are built...
Mianchi bauxite mine
The 800kt/a Mianchi open pit mine complex supplies both the Zhengzhou refinery (located in Gongyi City in Henan Province, 163km from the mine) and ...
Tiandong (Alumina) alumina refinery
Tiandong was commissioned in 2012 and is fully owned by Jinjiang Group. The nameplate capacity of the plant is 1.5Mtpa, consisting of two trains, a...
Jingxi alumina refinery
Commissioned in 2008, SGA is supplied to feed the Xinfa system and for third party sales. Bauxite is supplied from a captive mine with estimated re...