Browse our coal reports
Access our integrated research on thermal and metallurgical coal markets, as well as detailed mine-level analysis spanning more than 1,400 assets.
Purchase by credit card or invoice
Featured reports
Coal reports
Yulin aluminium smelter
We assume that Lines 2-4 will be brought on-line in 2012-2014. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number ...
Zhaofeng aluminium smelter
Zhaofeng consisted of two plants, which we cost as a single entity. Plant 1 (63kt/a) was permanently closed in early 2013. Wood Mackenzie’s asset r...
Baotou East Hope aluminium smelter
Line 3 raised site capacity to 880kt/a. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metric...
Jingxi aluminium smelter
The smelter initially planned four lines, but by 2013, only two were complete. Wood Mackenzie’s asset reports are built from the bottom up, incorpo...
Liupanshui aluminium smelter
We include the first 400kt/a phase of the 800kt/a expansion in our base case, which we include from 2015. Wood Mackenzie’s asset reports are built ...
Qingtongxia (P) aluminium smelter
The smelter was commissioned in 2001. With the permanent closure of the Søderberg lines in 2004, Qingtongxia became an exclusively prebake operatio...
Viewing page 76 of 269