Liuzhou Longcheng zinc smelter
The zinc smelter was put into operation in 1990 and comprised roasting and sulphuric acid plants. Slab zinc capacity was originally 35kt/a, but thi...
Livengood gold mine project
Livengood is expected to be developed as a large-scale open pit mine with ore processed in a 17Mt/a gravity separation and carbon in leach (CIL) pl...
Longquan (Yichuan) aluminium smelter
Longquan comprises two separate plants, which we cost as a single entity. Wood Mackenzie’s asset reports are built from the bottom up, incorporatin...
Loulo gold mine
Loulo commenced operations in November 2005 and began as two open pit mines. Subsequently, two underground mines have been developed at the Gara an...
Louvicourt (Closed) zinc mine
The Louvicourt mine closed in 2005. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to...
Luneng Jinbei alumina refinery
Most of the SGA produced is for internal use or committed to long term supply contracts. The refinery is owned by CPI. Wood Mackenzie’s asset repor...