Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Luoping zinc smelter
The Luoping zinc smelter was built in 1995 with a capacity of 12kt/a slab zinc and has expanded over the years to the current 120kt/a capacity. How...
Mission copper mine
The Mission complex comprises open pit mining of the Mission, Eisenhower, Pima, Mineral Hill, North San Xavier and South San Xavier properties. The...
Annaka zinc smelter
The Annaka zinc smelter in Japan uses roast-leach-electrowin technology, with the leach residue being treated by a Waelz kiln. The current capacity...
Jilang Indium (Zinc) zinc smelter
The Jilang smelter commenced production in late 2005 with an initial zinc smelting capacity of 18kt/a. It expanded capacity to 50kt/a in 2009, foll...
Jinli (Zinc) zinc smelter
The Jinli smelter was commissioned in September 2021 and commenced trial production in early December 2022 with a capacity of 150kt/a. The plant in...
Jinwan (Jiangxi) zinc smelter
Jiangxi Copper Company Limited (JCCL) began the construction of the 100kt/a capacity Jinwan zinc smelter in June 2009 at a cost of US$75M (RMB497M)...
Viewing page 96 of 450