Multi Harapan Utama Busang coal mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
- Participation
-
Geology
- Coal seams
-
Reserves and resources
- Marketable reserves
-
Production
- Production
- Production
-
Operations
- Operations
-
Infrastructure
- Infrastructure
-
Costs
- Cash costs
- Cash costs
- Capital costs
-
Sales contracts
- Product quality
-
Economic assumptions
- Economic assumptions
Tables and charts
This report includes 14 images and tables including:
- Key facts: Table 1
- Detailed map
- Participation: Table 1
- Geology: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Image 1
- Operations: Table 1
- Infrastructure: Table 1
- Costs: Table 1
- Costs: Image 1
- Costs: Table 2
- Sales contracts: Table 1
- Economic assumptions: Table 1
What's included
This report contains:
Other reports you may be interested in
Multi Harapan Utama Gitan coal mine
A detailed analysis of the Multi Harapan Utama Gitan coal mine.
$2,550Multi Tambangjaya Utama coal mine
A detailed analysis of the Multi Tambangjaya Utama coal mine.
$2,550Coal asset report - Bara Alam Utama coal mine - October 2022
A detailed analysis of the Bara Alam Utama coal mine.
$2,550