Asset Report
Caber zinc mine project
Report summary
There are two known mineralised zones on the Caber property, the Caber and Caber North deposits. The accompanying analysis considers a conventional underground mine with ore transported by road (38km) to Glencore’s Matagami concentrator. The accompanying analysis tentatively regards production from 2033 as being possible but speculative as no development timetable had been announced by the end of 2021.
Table of contents
- Summary
- Key issues
- Emissions
- CAPEX
- Mining
- Processing
Tables and charts
This report includes 4 images and tables including:
- Caber Project Emission Intensity Quartile Ranking - total global production - tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Horne 5 zinc mine project
A detailed analysis of the Horne 5 zinc mine project
$2,250
Asset Report
Metates zinc mine project
A detailed analysis of the Metates zinc mine project.
$2,250
Asset Report
Back Forty zinc mine project
A detailed analysis of the Back Forty zinc mine project.
$2,250