Asset Report
Veles zinc smelter
Report summary
The ISF smelter at Veles was commissioned in October 1973 with a capacity of 65kt/a ISF zinc and 35kt/a lead. In June 2003 the smelter was "temporarily" closed for an indefinite period. In 2008, Veles city council approved site clean-up and redevelopment. However in 2009, the site was bought by Metrudhem, who stated that they wanted to restart the smelter. There was much local opposition to the plan, and the smelter did not restart. As such, it is assumed that the smelter will never restart.
Table of contents
- Summary
- Key Issues
- Location / Transport
- Conc. Receipt / Storage
- Sinter Plant
- Acid Plant
- Smelting Furnace
- Refining
- Casting Plant
- Slag Disposal
- Other
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
30 August 2022
Townsville zinc smelter
Asset Report
Townsville zinc smelter
A detailed analysis of the Townsville zinc smelter.
$2,25018 November 2022
Miasteczko Slaskie zinc smelter
Asset Report
Miasteczko Slaskie zinc smelter
A detailed analysis of the Miasteczko Slaskie zinc smelter.
$2,25030 August 2022
Juiz de Fora zinc smelter
Asset Report
Juiz de Fora zinc smelter
A detailed analysis of the Juiz de Fora zinc smelter.
$2,250