Browse our coal reports
Access our integrated research on thermal and metallurgical coal markets, as well as detailed mine-level analysis spanning more than 1,400 assets.
Purchase by credit card or invoice
Coal reports
Jingxi alumina refinery
Commissioned in 2008, SGA is supplied to feed the Xinfa system and for third party sales. Bauxite is supplied from a captive mine with estimated re...
Lingshi (Alumina) alumina refinery
Lingshi was designed in 3 phases: two 800ktpa phases and one 1000ktpa phase. Phase one was commissioned in early 2016 and phase two in December 201...
Liulin Senze alumina refinery
The refinery was commissioned in 2009. It has several bauxite mines within 100km of the plant. SGA is sold to local smelters while NMA is supplied ...
Tiandong (Alumina) alumina refinery
Tiandong was commissioned in 2012 and is fully owned by Jinjiang Group. The nameplate capacity of the plant is 1.5Mtpa, consisting of two trains, a...
Mettur Dam alumina refinery
Production ceased in 2009, a year after the closure of the adjacent smelter. We have no base case restart. Wood Mackenzie’s asset reports are built...
Mianchi bauxite mine
The 800kt/a Mianchi open pit mine complex supplies both the Zhengzhou refinery (located in Gongyi City in Henan Province, 163km from the mine) and ...
Viewing page 27 of 268