Nanchuan alumina refinery
The refinery was commissioned in 2010 and uses a 20km underground pipe to transfer the bauxite. The plant produces both SGA and NMA for use within ...
Wuchuan alumina refinery
We expect start up in 2014-2015. The project is part of an integrated complex, to include 2Mt/a bauxite, 800kt/a alumina, 400kt/a aluminium, 200kt/...
Yangquan alumina refinery
The 600kt/a expansion project was completed by September 2012, but commissioning was delayed to end of 2013. Bauxite and caustic soda are both capt...
Kaili (Alumina) alumina refinery
Line 1 of the refinery was commissioned in May 2012. It had originally been designed with a capacity of 400ktpa but was later modified to 500ktpa. ...
Wusheng alumina refinery
Wusheng in Pinglu County started production in 2007. It has a nameplate capacity of 300ktpa and is in the second lowest quartile of our cost curve ...
Xing'an Chemicals alumina refinery
Effective capacity may be nearer 2.4Mt/a on full commissioning of Phase #2. Wood Mackenzie’s asset reports are built from the bottom up, incorporat...