Browse our metals reports
Identify opportunities and mined materials value chains from exploration and product transformation to end-use consumption.
Purchase by credit card or invoice
Metals reports
Clarksville zinc smelter
The Clarksville electrolytic zinc smelter was built on a greenfield site and commissioned in 1979. The design capacity was for a production of 81.6...
Taifeng zinc smelter
The Taifeng smelter was commissioned in 2002 with a capacity of 45kt/a. In 2008, construction began on a 60kt/a expansion of the smelter to raise t...
Chifeng zinc smelter
The original smelter at Chifeng had a capacity of 21kt/a and was commissioned in 1995. This was expanded to 50kt/a in 2003, with the addition of a ...
Baoji (ISF) zinc smelter
In late-2003 construction started on a greenfield site, 27km North of Baoji, of a 100kt/a zinc-lead ISF smelter with a design capacity of 67kt/a zi...
Sheba Ridge nickel project
The Sheba's Ridge Project is a large-scale, undeveloped PGM-Nickel-Copper asset located in South Africa. It is configured as a proposed large-scale...
Qineng (Aluminium) aluminium smelter
Qineng smelter is the largest smelters in Chongqing municipality (Southwest China). Approved as a “power-aluminium” Industrial Park Cluster Exhibit...
Viewing page 20 of 240