Baoji (ISF) zinc smelter
In late-2003 construction started on a greenfield site, 27km North of Baoji, of a 100kt/a zinc-lead ISF smelter with a design capacity of 67kt/a zi...
Chifeng zinc smelter
The original smelter at Chifeng had a capacity of 21kt/a and was commissioned in 1995. This was expanded to 50kt/a in 2003, with the addition of a ...
Onsan zinc smelter
The zinc smelter located in Onsan, near Ulsan in South Korea is operated by Korea Zinc and has a slab zinc capacity of 560kt/a. The Onsan flowsheet...
Årdal aluminium smelter
The smelter was commissioned in 1959. Installed capacity is more than 200ktpa. Wood Mackenzie’s asset reports are built from the bottom up, incorpo...
Tsumeb Tailings copper mine project
The project aims to treat tailings material from the mothballed Tsumeb mine. There is currently no timeline as to when the project will be develope...
Maroochydore copper mine project
Maroochydore is a copper oxide and secondary chalcocite deposit located 85 kilometres south east of the Nifty operation and 60 kilometres south-sou...