Browse our metals reports
Identify opportunities and mined materials value chains from exploration and product transformation to end-use consumption.
Purchase by credit card or invoice
Metals reports
Taifeng zinc smelter
The Taifeng smelter was commissioned in 2002 with a capacity of 45kt/a. In 2008, construction began on a 60kt/a expansion of the smelter to raise t...
Townsville zinc smelter
In the early 1990s Korea Zinc started studying the feasibility of building a new zinc smelter in Australia to service the growing Asia - Pacific ma...
Tres Marias zinc smelter
The Tres Marias Smelter was built to treat the oxide/silicate concentrate from the wholly owned Vazante open pit mines (calamine). Production comme...
Miasteczko Slaskie zinc smelter
The Miasteczko Slaskie smelter was formerly part of a Kombinatt that included the Boleslaw complex of mine and smelter, which together with the Olk...
Debari zinc smelter
The Debari smelter was commissioned in 1968 and had a capacity of 18kt/a zinc to treat concentrates from the Zawar group of mines. Installing a new...
Odda zinc smelter
Norzink was established in 1924 by La Compagnie Royale Asturienne des Mines. To ensure long-term power supplies Norzink entered into a long-term co...
Viewing page 25 of 243