Browse our metals reports
Identify opportunities and mined materials value chains from exploration and product transformation to end-use consumption.
Purchase by credit card or invoice
Metals reports
Qujing zinc smelter
The Qujing zinc smelter was a greenfield 100kt/a capacity smelter that formed part of a large new investment by Yunnan Chihong that included the ex...
Rio Blanco copper mine project
The project is located 180km east of the port of Parinas, adjacent to the border with Ecuador in Northern Peru, 200km northeast of Chiclayo. Feasib...
Chizhou (Anhui) zinc smelter
Chizhou Smelter was put into production in June 1958, as lead smelter with production capacity for lead being expanded from 60kt/a to 100kt/a in Se...
Clarksville zinc smelter
The Clarksville electrolytic zinc smelter was built on a greenfield site and commissioned in 1979. The design capacity was for a production of 81.6...
Huludao (ISF) zinc smelter
In 2001 the decsion was made to replace 60kt/a of the vertical retort capacity with an ISF smelter in 2004. This was a key state technical innovati...
Huludao zinc smelter
Huludao zinc smelter uses the electrolytic process to make slab zinc. However the site is shared with a vertical retort plant and and ISF making th...
Viewing page 26 of 243