Browse our metals reports
Identify opportunities and mined materials value chains from exploration and product transformation to end-use consumption.
Purchase by credit card or invoice
Metals reports
Skouries copper mine project
The Skouries project involves mining by a combination of open pit and underground methods, over a 23 year mine life. Ore will be treated in an 8Mt/...
Taifeng zinc smelter
The Taifeng smelter was commissioned in 2002 with a capacity of 45kt/a. In 2008, construction began on a 60kt/a expansion of the smelter to raise t...
Clarksville zinc smelter
The Clarksville electrolytic zinc smelter was built on a greenfield site and commissioned in 1979. The design capacity was for a production of 81.6...
Debari zinc smelter
The Debari smelter was commissioned in 1968 and had a capacity of 18kt/a zinc to treat concentrates from the Zawar group of mines. Installing a new...
Huludao (ISF) zinc smelter
In 2001 the decsion was made to replace 60kt/a of the vertical retort capacity with an ISF smelter in 2004. This was a key state technical innovati...
Huludao zinc smelter
Huludao zinc smelter uses the electrolytic process to make slab zinc. However the site is shared with a vertical retort plant and and ISF making th...
Viewing page 46 of 244