Chelopech copper mine
Dundee Precious Minerals acquired the Chelopech operation in 2003. The copper concentrate is high in arsenic and is treated at the Dundee owned Tsu...
Jiyuan (Yuguang) zinc smelter
Construction of the Jiyuan zinc smelter, situated 10km North of Jiyuan City on a Greenfield site, started in 2003, and the plant was commissioned i...
Mian Xian (Bayi) zinc smelter
Zinc smelting commenced in 1999 with a capacity of 7kt/a slab zinc. The smelter processed calcine produced on redundant equipment at the Bayi coppe...
Golpu copper mine project
Golpu is a feasibility stage, porphyry copper-gold project in the Morobe Province of Papua New Guinea. The accompanying analysis is based on the sc...
Baiyin (ISF) zinc smelter
The original capacity of the No3 Smelter was 35kt/a zinc. In 2001 a major smelter renovation plan was instigated with the intention of raising the ...
Bayannaoer (Zijin) zinc smelter
Construction of the smelter started in 2005, with completion and commissioning in May 2006. Design capacity was 100kt/a slab zinc and 190kt/a sulph...