Browse our metals reports
Identify opportunities and mined materials value chains from exploration and product transformation to end-use consumption.
Purchase by credit card or invoice
Metals reports
Eliwana iron ore mine
FMG's Eliwana mine has been operational since December 2020 and has now reached full production capacity. In 2024, the mine produced 27.7 Mt, sligh...
Global zinc smelter asset cost summary
The Global Zinc Smelter Asset Summary examines the cost environment in the base year, historically, and forward years. The latest cost update slide...
Global zinc and lead mine cost summary
The 2025 annual average C1 plus sustaining cost has fallen year-on-year on a composite costing basis, driven by the lower realised benchmark treatm...
Magnitude 7 Metals aluminium smelter
Noranda's New Madrid smelter in Missouri was built in 1971. It remains the company's sole primary aluminium smelter, with a target capacity of 280k...
Aditya aluminium smelter
Aditya was commissioned in 2013 with a capacity of 360ktpa. Anodes and power are captive, while SGA is sourced within the company system. Wood Mack...
Warrick aluminium smelter
The smelter has an integrated rolling mill. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data me...
Viewing page 2 of 239