Browse our metals reports
Identify opportunities and mined materials value chains from exploration and product transformation to end-use consumption.
Purchase by credit card or invoice
Metals reports
Baoji (ISF) zinc smelter
In late-2003 construction started on a greenfield site, 27km North of Baoji, of a 100kt/a zinc-lead ISF smelter with a design capacity of 67kt/a zi...
Bayannaoer (Zijin) zinc smelter
Construction of the smelter started in 2005, with completion and commissioning in May 2006. Design capacity was 100kt/a slab zinc and 190kt/a sulph...
Trail zinc smelter
The Trail zinc smelter located in British Columbia, Canada is an electrolytic zinc smelting operation has both the typical Roast-Leach-Electrowin f...
Horne 5 copper mine project
The Horne 5 deposit is located beneath the working Horne copper smelter. Glencore owns the mineral rights on the first 200m beneath the surface whi...
Chifeng zinc smelter
The original smelter at Chifeng had a capacity of 21kt/a and was commissioned in 1995. This was expanded to 50kt/a in 2003, with the addition of a ...
Plovdiv zinc smelter
The decision to construct a zinc smelter at Plovdiv was taken in 1957 to enable the processing of the expanded output of concentrates in the Rhodop...
Viewing page 10 of 242